Obj. 3: Retention and VL Sup #1581
follow up with documentation of APS online tracking at marie reine Etoudi and a working session with the checklist
Status:
In Progress
Priority:
Normal
Assignee:
-
Start date:
08/10/2023
Due date:
08/10/2023 (about 14 months late)
% Done:
50%
Estimated time:
3.00 h
Description
with the check list i have verified the existence of all required tool and sops for retention .
No data to display